Portfolio > Fraternities / Sororities

When tackling a project for a Fraternity/Sorority there are many issues to address including: alumni boards, active chapter boards, fundraising activities, lending restrictions, complicated local and state codes, older buildings with outdated mechanical and electrical systems, etc. These issues and more always seem to create a very complex and unique project.

Feasibility studies are a great first step in preparing yourself for the proposed project at hand. We at Tecton have performed dozens of these studies. We have designed these studies to include all the vital information necessary for you and your board to grasp every important aspect of the project, both from a financial standpoint and a construction/design standpoint.


Acacia
Renovation of basement, 1st, 2nd, and 3rd floors. New flooring in basement. Complete refinish of entry, vestibule, phone room, coat room. 1st floor - renovation of existing study room into a new library, enlarge/refinish men's restroom. 2nd floor - elimination of existing smaller restroom to enlarge adjacent study room, elimination of existing study room to enlarge main restroom. 3rd floor - replace vinyl flooring with ceramic in two smaller shower rooms.

Delta Tau Delta
Complete interior renovation of a 21,500SF space. Renovation included a complete upgrade including all new MEP's, sprinkler, data/networking, fire/security, flooring, windows, doors/hardware, complete bathroom upgrades, interior framing, drywall, ceilings, paint.

Theta Tau
Construction of new, free-standing 12,000SF building with 3,000SF finished walk-out basement.

Alpha Gamma Delta
Remodel kitchen, public area and front patio.

Alpha Gamma Rho
New construction, 15,000SF.

Beta Sigma Pi
Added aesthetic value to the main floor common areas with new carpet in living room and study rooms, new flooring in the kitchen and dining rooms, replaced doors and hardware. Second floor, repaired bathroom drains and floors.

Delta Chi
Building renovation. New air conditioning and fire protection system. Remodel front entry and kitchen serving area. Install new carpet. Repaint all interior.

Delta Delta Delta
New construction 20,000SF.

Kappa Kappa Gamma
New addition; 3 floors each with student rooms, common areas and study areas, 2,000SF on each floor.

Phi Delta Theta
Project consisted of column rebuild, installation of new interior doors, replacement of ceramic tile in the entries and restroom, repair of roof and gutter, replacement of exterior siding and exterior painting.

Phi Kappa Psi

Sigma Chi
Addition of 1,500SF on each of two floors for additional study/bedrooms and dining room extension; stucco exterior and slate roof installed to match existing building. Existing kitchen remodeled. Repaired/replaced all windows, interior doors, much of the plumbing, all restrooms with new fixtures, showers, ceramic tile walls and floors. Reworked/refinished oak paneling in the great room.

Theta Xi
Chapter room remodeled and refinished. New front stair installed and rear stair tower built. Some upgrades to electric and HVAC systems. All new kitchen equipment and floor coverings. Main bathroom and shower areas completely renovated. New closet shelves added to dorm rooms.

Copyright © 2011, Tecton Construction Management, Inc. All Rights Reserved.
Employee Login