Renovation of both High School and Elementary Buildings including:
• Major overhaul and replacement of every HVAC building system and plumbing fixture for both buildings
• Total renovation of locker rooms for both the High School Gym #1 and the Elementary School
• Addition of new lunch room (approx. 4,000sf), kitchen expansion & dish room relocation in Elementary
• Minor structural repairs, window replacements and bathroom upgrades for both buildings
• The 2nd story High School classroom window wall was replaced
• Repair/replacement of casework, doors and hardware in both buildings
• Upgrade of miscellaneous finishes throughout both buildings
• All new lighting, new ceilings, new flooring and paint in classrooms and hallways
• Electric panel upgrade
The use of the Tecton Filtering™ system resulted in all of this work being accomplished for $37/sf.
Constructed new 2-story lab/classroom wing. Demo'd original 2-story High School wing. Created new commons area. Renovated High School Administration area and 2nd floor halls and labs into standards classrooms. 35,000SF of new construction and 12,000Sf of renovated space.